Skip to main content

    See the Reports Before You Sign Up

    Your report format. Your case data. Inspect populated tables, supporting details and a worked assessment in an actual company-template report—then download the redacted PDF or editable Word file.

    US readers: the pre-site example uses a Florida property setting and is a pre-renewal walkthrough, not a settled claim. The fire, machinery and cargo examples use Indian claim contexts. These examples do not establish carrier approval or a universal reporting standard.

    Watch the product walkthrough, then inspect the output

    Dictated on site as voice notes, in Hindi and English

    Geotagged photos and claim documents attached in the field

    Evidence cross-checked, conflicts flagged for the surveyor

    Cargo / Assessment

    A Filled Company Template — Cargo Report & Assessment

    20 selected original pages: case particulars, invoice tables, inspection findings, assessment calculations and policy analysis—all in the company’s report format.

    Abridged from an owner-supplied Indian inland-transit report. Identifying details, branding and signatures masked; layout, dates, quantities and figures retained. Extended annexure material omitted from this shorter sample; the complete report remains available.

    Professional review required. The original evidence conflicts, open coverage questions and unapplied policy-wide limit remain visible. This is a report sample, not a settlement approval or an independent audit.

    • Original template pages with populated fields and source references
    • Claimed vs assessed quantities, rates, amounts and policy workings
    • Selected policy analysis; complete 28-table report available in Word

    Fire / Property Claim

    Fire Insurance Survey Report — Draft

    A draft example from a biomass pellet factory fire inspection in India. Shows field photographs, report sections and an evidence-conflict appendix. Its cause, coverage and financial assessment require professional review; it is not a submission-ready report.

    Professional review required. Draft under review: the previous payable figure did not reconcile with the listed amounts and has been withdrawn. Cause, coverage, quantities and unresolved evidence also require verification. Do not use this sample as a settlement or coverage determination.

    • 13 structured sections from insured introduction to draft recommendations
    • Assessment inputs retained for review; no payable amount endorsed
    • Geotagged site photographs from the actual survey
    • Evidence Conflicts appendix with an outstanding high-priority review item

    PDF · 6 pages · 0.6 MB

    Engineering / CPM Claim

    Contractor's Plant & Machinery Survey Report

    A CPM claim survey for a hydraulic excavator struck by a falling boulder at a stone crusher site. Includes OEM parts-level repair valuation, notional assessment after claim withdrawal, and an integrity assessment section.

    • Component-level damage table matched against the OEM repair schedule
    • Notional loss computation: 20% of quotation base less policy excess
    • Documents verification table covering invoice, quotation, and withdrawal letter
    • Evidence Conflicts appendix: quotation amounts and model variants reconciled

    PDF · 6 pages · 0.6 MB

    Marine / Transit Damage Claim

    Marine Cargo Final Survey Report

    A transit damage survey for a ceramic tile consignment broken en route from Morbi to Chennai. Item-wise sound and damaged quantities, joint inspection findings, salvage disposal, and document discrepancies caught across invoices and challans.

    • Item-wise survey findings: 703 boxes across four tile products
    • Consignment, transit, and delivery records in standard cargo format
    • Damage photographs with geotag overlays redacted
    • Evidence Conflicts appendix: invoice numbers, LR numbers, and vehicle registrations cross-checked

    PDF · 4 pages · 0.4 MB

    Property Walkthrough / Pre-Renewal

    Pre-Site Inspection Report

    A pre-renewal walkthrough of a nine-story beachfront resort, dictated room by room as voice notes. FieldScribe AI structured 15 findings with condition ratings, risk statements, and a prioritized remediation table.

    • 15 findings across lobby, pool deck, kitchen, fire pump room, garage, and roof
    • Condition ratings and risk statements generated from spoken observations
    • Three HIGH priority life-safety findings with 30-day remediation windows
    • Prioritized recommendations table ready for the insured and broker

    PDF · 4 pages · 0.35 MB

    Your Next Report Could Look Like This

    Capture your observations on site, upload the claim documents, and FieldScribe AI drafts the full report for your review. Free for 14 days, no credit card required, and we help you set up your first report.