See the Reports Before You Sign Up
These four sample reports were generated with FieldScribe AI from real field inputs: voice notes, photographs, and claim documents captured during actual surveys. Names, policy numbers, and locations have been replaced with fictional details. The structure, depth, and formatting are exactly what you get.
Dictated on site as voice notes, in Hindi and English
Geotagged photos and claim documents attached in the field
Evidence cross-checked, conflicts flagged for the surveyor
Fire / Property Claim
Fire Insurance Survey Report
A final survey report for a fire loss at a biomass pellet factory. Spontaneous combustion in stored agricultural husk, volumetric loss assessment, coverage adequacy review, and an evidence-conflict appendix showing how contradictory voice notes were resolved.
- 13 structured sections from insured introduction to final recommendations
- Provisional loss computation with deductible and debris-removal allowance
- Geotagged site photographs from the actual survey
- Evidence Conflicts appendix: contradictory voice notes flagged and resolved
Engineering / CPM Claim
Contractor's Plant & Machinery Survey Report
A CPM claim survey for a hydraulic excavator struck by a falling boulder at a stone crusher site. Includes OEM parts-level repair valuation, notional assessment after claim withdrawal, and an integrity assessment section.
- Component-level damage table matched against the OEM repair schedule
- Notional loss computation: 20% of quotation base less policy excess
- Documents verification table covering invoice, quotation, and withdrawal letter
- Evidence Conflicts appendix: quotation amounts and model variants reconciled
Marine / Transit Damage Claim
Marine Cargo Final Survey Report
A transit damage survey for a ceramic tile consignment broken en route from Morbi to Chennai. Item-wise sound and damaged quantities, joint inspection findings, salvage disposal, and document discrepancies caught across invoices and challans.
- Item-wise survey findings: 703 boxes across four tile products
- Consignment, transit, and delivery records in standard cargo format
- Damage photographs with geotag overlays redacted
- Evidence Conflicts appendix: invoice numbers, LR numbers, and vehicle registrations cross-checked
Property Walkthrough / Pre-Renewal
Pre-Site Inspection Report
A pre-renewal walkthrough of a nine-story beachfront resort, dictated room by room as voice notes. FieldScribe AI structured 15 findings with condition ratings, risk statements, and a prioritized remediation table.
- 15 findings across lobby, pool deck, kitchen, fire pump room, garage, and roof
- Condition ratings and risk statements generated from spoken observations
- Three HIGH priority life-safety findings with 30-day remediation windows
- Prioritized recommendations table ready for the insured and broker